On Thursday September 21 and Friday September 22 the basement and garage floors were prepared and poured. Here are some photos from those days.

0923ConcreteFloor01.jpg
Forms were built and 5" of stone added to the floor.

0923ConcreteFloor02.jpg
David and Phil compact the stone and check for the proper elevation.

0923ConcreteFloor03.jpg
Gary roughs in the sewer lines.

0923ConcreteFloor04.jpg
After the stone and rough-in plumbing.

0923ConcreteFloor05.jpg
The shiny stuff is metalized bubble wrap - radon and moisture barrier, plus heat retention.

0923ConcreteFloor06.jpg
Malcolm and Jimbo install the in-floor radiant heat.

0923ConcreteFloor07.jpg
The tubing is cross-linked polyethylene with oxygen barriers & more...

0923ConcreteFloor08.jpg
After the in-floor heating tubes are installed.

0923ConcreteFloor09.jpg
The concrete arrives on Friday morning.

0923ConcreteFloor10.jpg
Let the pouring begin!

0923ConcreteFloor11.jpg
David Miller uses the new power screed.

0923ConcreteFloor12.jpg
Gary floats the surface.

0923ConcreteFloor13.jpg
Mel is excited watching the progress.

0923ConcreteFloor14.jpg
But Jasmine didn't care for the concrete truck noise, and decided to wait in the car.

0923ConcreteFloor15.jpg
When the conveyor broke on the 2nd load, necessity became the mother of invention.

0923ConcreteFloor16.jpg
Using the Bobcat to anchor the concrete conveyor. Extra style points for going through the window!

0923ConcreteFloor17.jpg
Greg and Phil declare the power screed was a real back-saver.

0923ConcreteFloor18.jpg
David tries out his new remote-controlled power trowel.

0923ConcreteFloor19.jpg
But in the end he reverted to an earlier technology to finish the job.