John & Melanie Richard

Home | Landscaping | Summertime Fun | Making It Home | Almost Finished | Siding and Trim | Finishing the Inside | Inside Work | Cherry Floors | Windows | Roof & Doors | Framing | Concrete Floors | Basement Walls | Driveway Evolution | Lot 21 | House Plans | Contact Us
Windows

March 18th update:
After spending the winter inside, and being moved from room to room, the prow windows were installed last week.

0317Windows01.JPG
Greg and Hootie carry the window to the back of the house...

0317Windows02.JPG
... where it is loaded onto the manlift.

0317Windows03.JPG
David (our builder) uses the manlift to raise the window to position.

0317Windows04.JPG
The window is moved from the manlift into its place in the wall.

0317Windows05.JPG
Shims are used to level the window, and it is nailed into place.

0317Windows06.JPG
The loft windows installed.

0317Windows07.JPG
The casings have been installed in some of the prow windows.